2026 Building, Engineering, and Zoning Fees
Note: A $4.50 Fee is Assessed in Accordance to PA Act 13 of 2004, Where Noted.
A. BUILDING PERMIT FEES: | |
|---|---|
| New Dwelling - RESIDENTIAL | |
| First 2,000 Sq. Ft. | $1,600.00 |
| Each Additional 200 Sq. Ft. or Fraction Thereof. | $50.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| New Buildings/Accessory Buildings - NON-RESIDENTIAL | |
| First 1,000 Sq. Ft. | $1,200.00 |
| Each Additional 200 Sq. Ft. or Fraction Thereof | $150.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Building Additions - RESIDENTIAL (Accessory Building Requiring a Foundation) | |
| First 200 Sq. Ft. | $150.00 |
| Each Additional 500 Sq. Ft. or Fraction Thereof Up to 5,000 Sq. Ft. | $50.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Building Additions - (Accessory Building Requiring a Foundation) NON-RESIDENTIAL | |
| First 200 sq. ft. | $250.00 |
| Each Additional 200 Sq. Ft. or Fraction Thereof | $150.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Patio, Deck, and Porch - roofs and permanent covers - RESIDENTIAL | |
| First 200 Sq. Ft. | $100.00 |
| Each Additional 100 Sq. Ft. or Fraction Thereof | $10.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Patios, Decks and Porch- roofs and permanent covers - NON-RESIDENTIAL | |
| First 200 Sq. Ft. | $150.00 |
| Each Additional 100 Sq. Ft. or Fraction Thereof | $20.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Uncovered Patios and Decks - RESIDENTIAL | |
| First 150 Sq. Ft | $75.00 |
| Each additional 100 Sq. Ft. or Fraction Thereof | $25.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Uncovered Patios and Decks - NON-RESIDENTIAL | |
| First 100 Sq. Ft. | $100.00 |
| Each Additional 100 Sq. Ft. or Fraction Thereof | $25.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Alterations, Structural Replacements and Repairs (includes Attic and Roof) - RESIDENTIAL | |
| First $10,000 of Cost | $200.00 |
| Each Additional $5,000 or Fraction Thereof | $50.00 |
| Zoning* | $45.00 |
| Act 13 | $4.50 |
| * Exempt from Zoning if it is only interior alterations and there is no change of use or number of dwelling units | |
| Alterations, Repairs, and Structural Replacements - NON-RESIDENTIAL | |
| First $10,000 of Cost | $400.00 |
| Each Additional $10,000.00 or Fraction Thereof | $200.00 |
| Zoning* | $75.00 |
| Act 13 | $4.50 |
| * No Zoning required for interior-only alterations if there is no change of use | |
| Dumpsters and Portable Storage Units (Right-of-Way Only)* | |
| Residential or Non-Residential (per unit) | $45.00 |
| Renewal (per unit) | $25.00 |
| *On property permit required - good for 60 days | No Fee |
| New, Reconstructed*, or Expanded Driveways, Walkways, and Steps - RESIDENTIAL | |
| First 200 Sq. Ft | $35.00 |
| Each Additional 200 Sq. Ft. or Fraction Thereof | $5.00 |
| Zoning (only for new or expanded) | $45.00 |
| Act 13 | $4.50 |
| * Reconstructed involves replacement of base - resurface does not require a permit | |
| New/or Expanded Driveways, Parking Lots - NON-RESIDENTIAL **If Grading Permit is necessary, an additional fee is REQUIRED **See Grading - Earth Disturbance under Section I. Engineering Fees (Below) | |
| First 1,000 Sq. Ft. | $50.00 |
| Each Additional 1,000 Sq. Ft. or Fraction Thereof | $5.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| New or Expanded Driveways, Parking Lots (Non-Residential) **If Grading Permit is necessary, additional fee required | |
| First 1,000 square feet | $50.00 |
| Each additional 1,000 square feet or fraction thereof | $5.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Accessory Structures, Pergolas, Gazebos, Trellises and Animal Shelters - RESIDENTIAL (single, twin, duplex, townhouse) | |
| 100 Sq. Ft. and Under | $0.00 |
| The First 101 Sq. Ft. to 200 Sq. Ft | $35.00 |
| Each Additional 50 Sq. Ft. or Fraction Thereof | $20.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Accessory Structures, Including Trellises, windmills, under 2,000 Sq. Ft. - NON-RESIDENTIAL (not requiring a foundation) | |
| Each 100 Sq. Ft. or Fraction Thereof | $125.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Demolition - RESIDENTIAL - Removal of entire or partial structure | |
| First $1,000 of Cost | $50.00 |
| Each Additional $1,000 or Fraction Thereof | $20.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Demolition - NON-RESIDENTIAL - Removal of entire or partial structure | |
| First $1,000 of Cost | $100.00 |
| Each Additional $1,000.00 or Fraction Thereof | $20.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Free Standing Permanent Outdoor Wood Burning Fireplaces and Grills | |
| Building | $25.00 |
| Zoning (Non-Residential / Residential) | $75.00 / $45.00 |
| Act 13 | $4.50 |
| Moving/Relocation of Structure - RESIDENTIAL and NON-RESIDENTIAL | |
| Same as New Dwelling or Building | |
| Foundation (Only) - RESIDENTIAL | |
| Building and Zoning Fees Will be Credited to New Dwelling/Building Application Fees. | $100.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Foundation (Only) - NON-RESIDENTIAL | |
| Building and Zoning Fees Will be Credited to New Dwelling/Building Application Fees. | $100.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Roofing and Siding and Stucco - RESIDENTIAL **No Zoning Permit Required | |
| First $5,000 of Cost | $60.00 |
| Each Additional $1,000 of Cost or Fraction Thereof. | $5.00 |
| Act 13 | $4.50 |
| Roofing, Siding, Stucco and Window Replacement - NON-RESIDENTIAL **No Zoning Permit Required | |
| First $5,000.00 of Cost | $60.00 |
| Each Additional $1,000 of Cost or Fraction Thereof Up to $50,000 | $10.00 |
| Each Additional $1,000 of Cost or Fraction Thereof | $5.00 |
| Act 13 | $4.50 |
| Fence - RESIDENTIAL | |
| Per $1,000 of Cost or Fraction Thereof | $10.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Fence - NON-RESIDENTIAL | |
| Per $1,000 of Cost or Fraction Thereof | $10.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Pools – Capable of Holding 48 Inches or More **For In-ground Pools, see Grading - Earth Disturbance under Section I - Engineering Fees (Below) | |
| First $1,000 of Cost | $100.00 |
| Each Additional $1,000 of Cost or Fraction Thereof | $10.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Pool Demo/Fill In **If over 1,200 square feet in disturbance, it also needs a Grading Permit **See Grading - Earth Disturbance under Section I - Engineering Fees (Below) | |
| Building | $45.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Retaining Walls - NON-RESIDENTIAL/ RESIDENTIAL (Length multiplied by Average Height) | |
| Up to 100 Sq. Ft | $50.00 |
| Each Additional 100 Sq. Ft. | $25.00 |
| Zoning- Non-Residential/Residential | $75.00/$45.00 |
| Act 13 | $4.50 |
| Cell Towers, Antenna's and Light Standards - NON-RESIDENTIAL | |
| Up to First $1,000 of Cost | $100.00 |
| Each additional $1,000 or fraction thereof up to $200,000 | $10.00 |
| Each additional $1,000 or fraction thereof over $200,000 | $7.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| * Non-Tower Wireless Communication Facility Permit Fees are not to exceed $1,000 per ordinance 937 | |
| Billboards - NON-RESIDENTIAL (Off-site Outdoor Advertising Sign) | |
| Up to 672 Sq. Ft. | $175.00 |
| Each Additional 100 Sq. Ft. or Fraction Thereof | $25.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Signs - NON-RESIDENTIAL (Fee Based on Single Face Size) | |
| 2 Sq. Ft. to 25 Sq. Ft. | $25.00 |
| 26 Sq. Ft. to 50 Sq. Ft. | $50.00 |
| 51 Sq. Ft. and Over | $75.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Signs requiring a foundation (Monument Sign), add additional $25.00 | |
| Temporary Sign Permit - NON-RESIDENTIAL | |
| **Zoning Only - (See Zoning Fees Below) | |
| **If Temporary Sign is Over 25 Sq. Ft. a BUILDING PERMIT will be REQUIRED. Follow Sign fees listed above. | |
| Construction Trailer, Field Office and Temporary Building - NON-RESIDENTIAL | |
| For a Period Not to Exceed One Year - per trailer | $50.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Temporary Tent | |
| Fire Marshal First Tent | $100.00 |
| Each Additional Tent | $25.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
B. USE AND OCCUPANCY PERMIT | |
|---|---|
| Residential or Home Occupation Use | $55.00 |
| Zoning | $45.00 |
| Act 13 | $4.50 |
| Non-Residential Use | $100.00 |
| Zoning | $75.00 |
| Act 13 | $4.50 |
| Fire Marshal | |
| 0-2,999 square feet | $55.00 |
| 3,000-4,999 square feet | $85.00 |
| 5,000-9,999 square feet | $125.00 |
| 10,000-29,000 square feet | $200.00 |
| 30,000-49,000 square feet | $275.00 |
| 50,000-99,999 square feet | $350.00 |
| 100,000+ square feet | $450.00 |
| Each additional 25,000 sf beyond 100,000 sf | $100.00 |
| Common Area | $150.00 |
| Apartment/Hotels | Common Area Fee + $10 per unit/room |
| Reinspection Fee | $150.00 |
C. PLUMBING PERMIT | |
| Installed fixtures, sanitary drainage and water supply, gas line | |
| First $5,000 of cost | $75.00 |
| Each additional $2,000 of cost or fraction thereof | $10.00 |
| Act 13 | $4.50 |
| Sewer Lateral (New or Replacement) | |
| First $5,000 of cost | $150.00 |
| Each additional $1,000 of cost or fraction thereof. | $10.00 |
| Act 13 | $4.50 |
| Sewer Connection Fee (Checks made out to: Whitemarsh Township Authority) | $3,500.00 |
| Deep Well Permits | $25.00 |
| Act 13 | $4.50 |
| Plumber Registration - Master Plumber | |
| Initial Registration | $50.00 |
| Re-registration by 2/1 of current year | $35.00 |
| Plumber Registration - Journeyman Plumber | |
| Initial Registration | $25.00 |
| Re-registration by 2/1 of current year | $20.00 |
D. ELECTRICAL PERMIT | |
| Electrical Permit | |
| First $2,000 of cost | $150.00 |
| Each additional $1,000 of cost or fraction thereof | $30.00 |
| Act 13 | $4.50 |
| Commercial | |
| First $2,000 of cost | $200.00 |
| Each additional $1,000 of cost | $30.00 |
| Act 13 | $4.50 |
| Solar Panel Systems w/Electric (**Requires a ZONING PERMIT) | |
| First $2,000 of cost | $150.00 |
| Each additional $2,000 of cost or fraction thereof | $30.00 |
| Fire Marshal Permit- Non-Residential/Residential | $100/ $50 |
| Zoning - Non-Residential (All)/Residential (Ground Mount Only) | $75.00/$45.00 |
| Act 13 | $4.50 |
| Township Engineer (if required) | $75.00 |
E. MECHANICAL PERMIT | ||
| Mechanical Permit (Residential & Non-Residential) | ||
| First $5,000 of cost | $75.00 | |
| Each additional $2,000 of cost or fraction thereof | $10.00 | |
| Act 13 | $4.50 | |
| Geothermal Systems | ||
| First $5,000 of cost | $50.00 | |
| Each additional $2,000 of cost or fraction thereof | $10.00 | |
| Act 13 | $4.50 | |
| RENTAL FEES * The Fees associated with Ordinance No. 886 shall cover the cost associated with the initial inspection and one re-inspection, any subsequent re-inspections will be charged an additional Fee. | ||
| Regulated Rental Units Application Fee: | $80.00/unit | |
| Fee Paid Prior to April 1st of the first year of a Program Cycle | $100.00/unit | |
| Fee Paid Prior to June 30th of the first year of a Program Cycle | $125.00/unit | |
| Fee Paid After June 30th of the first year of a Program Cycle | $125.00/unit | |
| Fee for a Second Re-inspection and all additional inspections | $125.00 per Inspection | |
| Fee to Reinstate a Revoked Occupancy Certificate | $125.00/unit | |
| Application to the Board of Appeals in association with the Residential Rental Housing Registration and Inspection Program | $250.00 | |
| F. FIRE MARSHAL | |
| Inspected Business or Commercial Property Square footage | |
| 0-2,999 square feet | $55.00 |
| 3,000-4,999 square feet | $85.00 |
| 5,000-9,999 square feet | $125.00 |
| 10,000-29,000 square feet | $200.00 |
| 30,000-49,000 square feet | $275.00 |
| 50,000-99,999 square feet | $350.00 |
| 100,000+ square feet | $450.00 |
| Each additional 25,000 square feet beyond 100,000 square feet | $100.00 |
| Reinspection Fee ** Is charged for any inspections after the initial reinspection; 25% fee will be assessed to all fire inspection invoices over 90 days old. | $150 |
| Fire Suppression Systems, Standpipes - Hose Cabinets, Fire Hydrants and Fire Service Mains | |
| New Construction | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| TANK Permit for Flammable, Combustible Liquid or Gas, Cryogenic Fluid, Removal, Abandonment. REPLACEMENT OR NEW INSTALLATION | |
| First $2,000 of cost | $75.00 |
| Each additional $2,000 of cost or fraction thereof | $10.00 |
| Act 13 | $4.50 |
| Alteration and Repairs | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Automatic and Manual Fire Alarms, and Detection Systems (Exception: One and two-family dwellings not connected to an Auto Dealer or Central Station System) | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Food Truck (Trucks MUST apply 14 days prior to event) | |
| Permit Application | $75.00 |
| Permit Applications received less than 14 days prior to event | $150.00 |
| Installation of Stationary Battery Systems and/or Capacitor energy storage system. New installation or repair | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Compressed Gas Systems: New installation, alteration, or repair | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Emergency Responder Radio Coverage System. New installation or repair. | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Temporary Tents or Similar Structures | |
| ** See Building and Zoning Fee Schedule | |
| Installation of fuel cell power systems. NEW INSTALLATION, ALTERATION, OR REPAIR | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Gas Detection Systems. NEW INSTALLATION or ALTERATION. | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Gates or barricades across fire apparatus access roads. New installation, alteration, or repair | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Hazardous Materials Storage or Facility. NEW INSTALLATION, REPAIR, ABANDON, REMOVE, PLACE OUT OF SERVICE, CLOSE, OR SUBSTANTIALLY MODIFY | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Industrial Ovens. NEW INSTALLATION AND REPAIR | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Liquified Petroleum Gas System. NEW INSTALLATION, ALTERATION, OR REPAIR. | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Motor vehicle repair rooms and booth. NEW INSTALLATION or ALTERATION. | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Plant extraction systems. NEW INSTALLATION or ALTERATION. | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Solar Photovaltaic power systems. NEW INSTALLATION, ALTERATION, OR REPAIR. | |
| **See Building & Zoning | |
| Special Event Structure not regulated by the International Building Code. INSTALLATION/REMOVAL UNDER ONE PERMIT | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Spraying or Dipping Room, dip tank, or booth. (New Installation, Alteration, or Repair) | |
| First $1,000 of cost | $100.00 |
| Each additional $1,000 of cost or fraction thereof | $25.00 |
| Act 13 | $4.50 |
| Temporary Tanks for heating construction sites | |
| Up to one year | $50.00 |
| Fireworks Permits (Must Be Received 45 days PRIOR to the event) | $200.00 |
| Fireworks Permit | $200.00 |
| Firework Permit received under 45 days prior to event | $400.00 |
| Fire Department Stand-By Fee | $500.00 |
| Fire Department Stand-By Fee under 45 days prior to event | $1,000.00 |
| Fire Department Stand-By Fee on Holidays | $2,500.00 |
| Fire Department Stand-By Fee on Holidays under 45 days notice prior to event | $5,000.00 |
| **Holidays Defined As: New Years Eve, New Years Day, Memorial Day, July 3rd & 4th, Labor Day, Thanksgiving and Christmas** | |
| Blasting Permit | $100.00 |
| Act 13 | $4.50 |
| Hot Work Permit (Temporary work involving open flames, production of heat, sparks in occupied tenant space.) Such as: torch applied roofing, welding, soldering, thawing pipe, or grinding.) | $100.00 |
| Act 13 | $4.50 |
| Fire Code Permit (All uses not listed above and permit requirements contained in the 2018 International Fire Code) | $75.00 |
| Act 13 | $4.50 |
| Permanent Outdoor Fireplaces and Grills | $25.00 |
| Fire Report | $50.00 |
| Expert Witness Fee (per hour) | $75.00 |
| Special Duty Rate | $45.00 |
| Video Tape Copy/Digital Photo Disk Copy | |
| Each tape or Digital Disk or Flash Drive | $100.00 |
| Special Inspection and Permit Review Services | Cost* |
| *Special Inspections and Permit Review Services refers to a 3rd party company doing inspections or a plan review. The cost is set forth by the individual company/agency. Plus 15% Administrative Fee | |
| Miles Park | |
| Grill Permit (Temporary Gas Grills Only, No Charcoal grills) | $25.00 |
| Operational Permit / Fire Code Permit | |
| **All uses not listed above and permit requirements contained in the 2018 International Fire Code** | |
| False Alarm Activations | |
| After three (3) false alarm activations within a 12-month period | $500.00 |
| Four (4) or more false alarm activations within a 12-month period | $1,000.00 |
G. ZONING FEES: | |
|---|---|
General Zoning Permit (Roofing and Siding EXEMPT) | |
| Food Trucks County Board of Health Certification & Township Transient Business License are both required before Zoning Permit can be issued | $75.00 |
| Zoning Verification Letter | $75.00 |
| Temporary Sign Permit **Signs must be removed 3 days after the date of the occurrence or of the event. | $25.00 |
| Zoning Hearing Board | |
| Fees are inclusive of Zoning Permit fee if permit application is submitted concurrently or within 3 months of approval or of notification that a Zoning Hearing Board application is required. | |
| Application for Variance, Special Exception, or Appeal from Zoning Officer’s Decision RESIDENTIAL USE | |
| First Lot | $750.00 |
| Each Additional Lot | $150.00 |
| Fence, Generator, Walkway, Accessory Structure over 200 square feet, or Driveway Expansion over 200 square feet | $500.00 |
| Application for Variance, Special Exception, or Appeal from Zoning Officer’s Decision NON-RESIDENTIAL USE | |
| Per Lot | $1,200.00 |
| Non-Residential Use - Sign Only (Per Lot) | $500.00 |
| Proposed Major Subdivision or Land Development | $1,500.00 |
| Continuance Fee if requested by Applicant | |
| No new advertising | $200.00 |
| Re-advertising is necessary* (*If new 500-foot notices are necessary, add cost of postage) | $500.00 |
| Approval Extension or Re-Approval Post Extension (No new relief being sought) | $500.00 |
| Application for Challenge to Validity of Zoning Ordinance or Map | |
| Per Application | $1,500.00 |
| Copy of Stenographic Record - Contact Township | |
| Board of Supervisors | |
| Zoning Ordinance Amendment | |
| Per Application for Administrative Costs | $1,000.00 |
| Plus Escrow Deposit to Cover Costs for Legal and Engineering Reviews | $5,000.00 |
| Curative Amendment | |
| Per Application for Administrative Costs | $1,000.00 |
| Plus Escrow Deposit to Cover Costs for Legal and Engineering Reviews | $5,000.00 |
| Conditional Use Application | |
| Fees are inclusive of Zoning Permit fee if permit application is submitted concurrently, or within 3 months of approval or of notification that Conditional Use application is required. | |
| Application Fee | $500.00 |
| Copy of Stenographic Record - Contact Township | |
| Non-Conforming Use Permit | $20.00 |
H. SUBDIVISION, LAND DEVELOPMENT, AND LAND DEVELOPMENT WAIVER REQUEST FEES:Established by Resolution #2012-07 | |
|---|---|
| No Application Fee - Escrow Fee ONLY* | |
| Subdivision and/or Land Development Sketch (Tentative) Plan | $2,500.00 |
| Minor Subdivision and/or Land Development Preliminary Plan | $5,000.00 |
| Major Subdivision and/or Land Development Preliminary Plan | $7,500.00 |
| Minor Subdivision and/or Land Development Final Plan | $3,000.00 |
| Major Subdivision and/or Land Development Final Plan | $5,500.00 |
| Waiver of Land Development *If preliminary/final, go with larger escrow amount only | $1,500.00 |
| Professional Services Agreement - Escrow | $2,500.00 |
I. ARBORIST FEES: | |
|---|---|
| Per hour fee | $135.00 |
| Fee-in-lieu per 3" caliper tree | $940.00 |
J. ENGINEERING FEES: | |
|---|---|
Grading - Minor Earth Disturbance Permit (Under 9,999 Sq. Ft. of Disturbed Earth) | |
| Application Fee | $175.00 |
| Escrow Fee | $2,000.00 |
| Regulated Earth Disturbance Permit (10,000+ sq. ft. disturbance) | |
| Application Fee | $275.00 |
| Escrow Fee | $5,000.00 |
| Road Occupancy Permits (Township Roads) | |
| Inspection Fees | |
| Underground Facility Installations | |
| First 50 Linear Feet | $100.00 |
| Each Additional 50 Linear Feet or Fraction Thereof | $25.00 |
| Street Openings for Utility Connections or Repairs | |
| Each Opening | $100.00 |
| New Curbs, Sidewalks and Driveway Aprons and Driveway Expansion | $75.00 |
| Utility Pole Installation/Replacement | $50.00 |
| Replacement of Curbs, Sidewalks and Driveway Aprons | $75.00 |
| Development Inspection Charges * Plus 5% Administrative Fee | |
| Principal Engineer | $165.00/Hour * |
| Assistant Engineer | $140.00/Hour * |
| Technical Assistant | $130.00/Hour * |
| Administrative Assistant | $88.00/Hour* |
| Right of Way Permit - Permit Renewal (Annual Fee) | $500.00 |
Contact Us
-
Whitemarsh Township Building & Permits
616 Germantown Pike
Lafayette Hill, PA 19444
Ph: 610-825-3535
Fx: 610-825-6252
Hours
Monday - Friday
8 a.m. - 4:30 p.m.
Staff Directory
Planning & Zoning
-
For information related to Planning & Zoning such as
- Use & Occupancy
- New Construction
- Subdivision & Land Development
- Zoning Districts,
- Conditional Use
- Zoning Hearing Board and more
Visit the Township Planning & Zoning Department page.